ERP system for the garment industry

Detailed planning, reporting and analysis of garment operations

Aurora ERP for the garment industry is our new solution for your business

For the needs of our clients working in the garment industry, we have developed a complete solution that satisfies every aspect of their specific operations. Our ERP system ensures the optimization of operations, an increase in company efficiency and the acquisition of a new competitive advantage.

The ERP we have developed for the garment industry will bring a number of benefits to your business, some of which are:

Aurora ERP система за шивашка индустрия
Z

Ensuring the continuity of the flow of raw materials and supplies needed to sustain the enterprise’s operations

Z

Reducing the funds invested in purchasing stock

Z

Optimal planning of production capacity

Z

Full tracking of toll manufacturing production

Z

Optimizing the payment for hired labor

Z

Accurate reporting of scheduled and unscheduled interruptions

Z

Better organization of warehouse operations and a reduction in warehouse costs

Z

Reducing the duration of the production cycle

Z

Tracking the enterprise’s operations in real time

Z

Improving administrative and organizational operations

Z

Complete control over the processes

Which core processes does Aurora ERP for the garment industry cover

Z
Customer order;
Z

Purchase order;

Z

Material resource planning;

Z

Reservation of material resources;

Z

Time schedule – cutting, sewing, packing;

Z

Manufacturing by a subcontractor;

Z

Reporting of cutting;

Z

Cutting – calculation of times and lays based on auxiliary resources;

Z

Reporting of sewing;

Z

Reporting of packing;

Z

Documentation of the sale;

Z

Dispatch;

Z

Control of receivables.

Key points in the Aurora ERP production model for the garment industry

Планиране в ERP за шивашка индустрия

Planning of garment production

➤ Planning the material resources needed to fulfill production orders. Reserving the required quantities.

➤ Toll manufacturing: a whole order or partial production.

➤ The ability to work with a substitute main material.

➤ Calculation of lays and planned time for producing the order.

➤ Time schedule for production orders. Determining estimated dates and times for fulfilling the orders.

➤ The ability to optimize the resources used according to a set criterion during their planning period.

Отчитане в ERP за шивашка индустрия

Reporting of the seamstresses’ production

➤ Reporting the actual time for cutting lays and assigning their execution to specific people and cutting tables.

➤ Tracking of technological, non-rational and rational waste.

➤ Assigning and reporting sewing tasks to specific operators according to a predefined sequence of operations.

➤ Actual reporting of the sewing time for each operation, the resource that performed the operation and the number of items reported.

➤ Assigning packing tasks to employees in real time and reporting labor.

➤ Accounting for labor, material cost and the recording of items into stock.

➤ Actual reporting of each employee’s earnings, calculation of bonus earnings according to the efficiency % achieved, and tracking of overtime.

Анализ в ERP за шивашка индустрия

Work analysis

➤ Analysis of the production employees’ work and comparison of planned and actual hours.

➤ Calculation of the employee efficiency percentage.

➤ Tracking of the semi-finished and finished products made, in quantity and value.

➤ Analysis of the raw materials, auxiliary resources, packaging and more used in production.

➤ Assessment of the duration of the production cycle and the time and reasons for interruption.

How will you optimize your operations with the ERP for the garment industry?

Aurora ERP for the garment industry gives its users the ability to optimize their operations through:

Z

Continuity of the flow of raw materials and supplies

One of the significant advantages that ERP Aurora for the garment industry provides is the generation of a planned production program based on the orders received, through which the required quantity of raw materials and supplies for its execution can be identified. Materials can be planned by order or for the entire production plan.

Z

Reducing the funds invested in purchasing stock

The program’s users can track warehouse stock in real time, the minimum required stock levels and the quantity of materials that need to be used in production based on customer orders. If, in the course of operations, any of the items used reaches the entered threshold values of the maintained stock, timely information is received in the ERP system.

Z

Optimal planning of production capacity

In real time, the economically most efficient option can be determined for loading the work shift and executing the individual processes within it, depending on the available raw materials and supplies, free machines, the duration of the work shift and the number of employees by department, while observing the deadline for fulfilling the orders.

Z

Full tracking of toll manufacturing production

The Aurora ERP model for the garment industry allows tracking of both orders received for toll manufacturing and semi-finished or finished products given to a subcontractor for production using own materials. In cases where a subcontractor’s services are used, the production parameters participate in the material and time planning of production, and the expected deliveries, actual execution, and ordered and received quantities can be tracked.

Z

Optimizing the payment for hired labor

It is possible to report the time for executing operations and their number for each employee individually. For this purpose, an Android app has been developed, through which the barcode of the respective operation is scanned. Based on the actual time worked and the number of operations performed to standard, the employee’s efficiency coefficient is calculated. This makes it possible to accurately calculate the labor remuneration.

Z

Accurate reporting of scheduled and unscheduled interruptions

Through the developed Android app, at each interruption of the work process, employees must indicate whether it is the result of a scheduled interruption, e.g. a lunch break, or an unscheduled interruption, e.g. an equipment breakdown. Through the resulting reporting information, company management can make informed decisions to minimize the time spent on unscheduled interruptions.

Z

Better organization of warehouse operations and a reduction in warehouse costs

The designation of locations for the delivered materials and the manufactured finished products, in combination with the use of HHT devices integrated with our ERP system, reduces the time for carrying out loading and unloading activities and eliminates the possibility of forming shortages of inventory due to incorrect storage. This has a direct impact on the size of warehouse costs.

Z

Reducing the duration of the production cycle

Every manager strives to organize the sequence of operations performed in a way that guarantees the shortest process duration. Through Aurora ERP for the garment industry and the built-in routing cards, adherence to the sequence of processes is guaranteed, since the starting of a particular operation by an employee in the app occurs exactly in the specific order defined for the respective product. In combination with minimizing unscheduled interruptions, this inevitably leads to a reduction in the duration of the production cycle.

Z

Tracking the enterprise's operations in real time

The system allows an unlimited number of users to work online simultaneously and the generation of reporting information in real time. This provides up-to-date information to the responsible persons, and in this way they can make informed decisions when forming the enterprise’s planning activities.

Z

Improving administrative and organizational operations

Reflecting the movement of materials and finished products through the use of documents specially designated for this purpose reduces manual labor, administrative involvement and the possibility of errors. Each operation is reflected at the moment it occurs by the operator responsible for its execution, and this can have both a warehouse and an automatic accounting reflection.

Z

Complete control over the processes

The reports provided give systematized information about every aspect of the enterprise’s operations. Through them, a comprehensive view of the processes in the enterprise is gained, and every operation can be analyzed and every cause that deviates the result from the set goal can be eliminated.

In what way will you increase your efficiency with our ERP for the garment industry?

ERP Aurora for the garment industry provides a number of opportunities for improving the organization of your operations. Improving the load on production capacity and the more efficient use of labor resources will have a direct impact on the cost price of production and, respectively, on the efficiency of the enterprise.

What competitive advantage will you gain with Aurora ERP for the garment industry?

ERP Aurora for the garment industry is a product with which you can be one step closer to cost leadership. The reporting information makes it possible to precisely calculate the cost price of products and, respectively, to set the lowest possible prices without this leading to losses for the enterprise.

ERP Aurora integrations with external systems

Magento
WooCommerce
Econt
eMag
Amazon
EasyPay
Е-фактура
Екод
Controlicy
SAP
Мегасофт

Бизнес навигатор

Генсофт
Фармастар
IQVIA
ДДС дневници
Микроинвест
MoneyWorks
Clock
Зерон
Connectivity
POS Master
EVO II
Horizon
Фарма слим
Artek 92 logo - client of ERP Aurora for the garment industry

Nikolay Vasilev

Operations Director

To meet the specific needs we had, SIS Technology AD developed and implemented additional features that contributed to the effective management, automation and planning of the production, accounting and organizational processes in the company. The result is satisfaction with what has been achieved and opportunities for upgrading to meet future challenges.

Clients who use ERP Aurora software for the garment industry model